Summary

Finding the best job for my career and seeking to go high on that same position.

Projects

Bio Gas Digestor

Experience

Company Logo
Quality Control Manager
Rolex PVC Pipes Industry
Nov 2015 - Present | Peshawar, Pakistan

1. Developed the laboratory for Rolex PVC pipes Industry.
2. Started Testing PVC pipe as per specifications and doing the following tests of PVC pipes by collecting samples from the production line.
3. Impact test, Hydrostatic pressure test, Methylene test, Heat Reversion test, opacity test, Specific Gravity and Fracture toughness test and formulation of Raw materials accordingly.
4. Developed formats for the specified tests.
5. Assisted the managerial staff in registration of the firm with different Government and Non-Government Organizations i.e. EPA, PSQCA, UNICEF, UNOCHA, UNDP, USAID, Department of Labor, ISO certification of 14001-2004 and Securities and Exchange Commission of Pakistan.
6. Started Record keeping of Lab tests and stock file of raw materials for Rolex PVC.
7. Formulation of the specified desired product as per customer demand and smooth running of extruder.
8. Our PVC Product range from 2'' to 8'' PVC pipe white and gray with HDPE Pipe black.
9. Daily Production Report and Daily stock Report Checking and compiling data in Excel.
10. Involved in Sales of Pipes and Purchase of Raw materials, workforce management and salaries formation.

Company Logo
Quality Control Inspector
REHAN CAN PVT LTD
Jun 2013 - Sep 2015 | Lahore, Pakistan

1. Visual inspection of Plastic cans from various production lines on regular basis following hourly scheduled format.
2. Checking the Plastic cans in laboratory for specified standards i.e Thickness, length, diameter and specific gravity.
3. Checking out the physical strength of cans by drop test method as dropping the can from specific height with full of water, as sample liquid.
4. Checking the raw materials by sampling some cans from them and testing them for the desire strength and durability and behavior of material in our machine.
5. Documenting each and every thing on daily basis and discussing flaws with the production head and removing them on routine basis.
6. Being in constant communication with production department and head of the department and finding ways to remove flaws from the system on mutual understanding in order to get the high quality end results with minimum wastage.
7. All the machines are Plastic injection molding machines with new automatic and old machines in operation.

Company Logo
Job Trainee
Cherat Cement Company Limited
Feb 2013 - Mar 2013 | Cherat, Pakistan

Worked as trainee engineer for 6 weeks.

Company Logo
Lecturer
Pak Educationa College Charsadda
Sep 2012 - Feb 2013 | Charsada, Pakistan

Giving lectures to first year and 2nd year students.

Company Logo
Lecturer
National Institute Of Science and Technology
Sep 2012 - Dec 2012 | Charsada, Pakistan

Education

NWFP University of Engineering & Technology
Bachelors, , Bachelors of Engineering‎
chemical engineering
CGPA 2.5/4
2010
Islamia College Peshawar
Intermediate/A-Level, , FSc (Pre Engineering)‎
Chemistry
Percentage 76%
2005
Islamia Collegiate School Peshawar
Matriculation/O-Level, , Matriculation in Science‎
Science
Percentage 83%
2003

Skills

Expert Handling Assignments
Intermediate In Page Desig

Languages

Expert Urdu
Expert English